Hi We made it. It started out as a rather chilly night on Dec. 07,08 at a camp along the St. Mary River. 29 degrees. But we were there may as well go paddlin. The gang arrived. Mac, Chuck, Myself,Joe F., Harry SR. ,Ray,HarryJR,Van, Dapper Al, Gray, Brian, All in for the cold night at the camp set up by Chucky. Some opted to sleep in trucks or set up tents for the night. (Me I slept in my truck) Then it was morning and in comes Bill at the appointed time set by Chuck. 7:58 am.
About an hour later we finally got it figured out we were gonna have the outfitter just take us back to the place we were gonna leave our cars. His place St. Marys Outpost & Fish Camp.
So off to the puttin spot.
Then for a lexurly ride down the river. No problems says the Outffitter
And we believe him. Looks like a start to a great trip.
Then reality sets in.
We start to get a little blow down traffic. But what we don't know is just a little farther down stream Crap.
This after we got Chuck's light boat around the blowdown. Then the real work started. As a very orgainized crew that we are (herdin cats)
we start carrying each boat around the strainer to continue down the river.
This what it looked like after the portage. Lots of good hard work by all got us through and back to floatin.
Here comes another one but not as bad. we just wormed through it. well most did. this one take Van for an unexpected swim. He seemed to think it was just the thing to do.
Here I think Ray was lookin to see if Harry SR was gonna come with him or stay behind.
I think he finnally said OK I Will Just Wait then
I'mLeavin Come On
Here we go
Finally the first camp
We stayed for 2 nights so Van could dry out and start a Chinese Laundry Service.
Then Supper
Bear eaten the end of Vals Chile that we had on the sausages Chuck brought for all here. Biggest sausages I ever seen.
After 2 nights it was back on the river.
OH before we leave this camp let me say we made it 3 whole miles on day one.
Camp 2
Made good milage this time probably 7.5 miles. Geezer warp speed.
Slight rain shower at this camp.
Full Moon over the river
Nightly Fire and fix all the worlds ills
Mac is in charge
Here is the Privy that all were wantin to see. Built and hauled by Harry SR
More to come the sequel and rest of the story
Joe
About an hour later we finally got it figured out we were gonna have the outfitter just take us back to the place we were gonna leave our cars. His place St. Marys Outpost & Fish Camp.
So off to the puttin spot.
Then for a lexurly ride down the river. No problems says the Outffitter
And we believe him. Looks like a start to a great trip.
Then reality sets in.
We start to get a little blow down traffic. But what we don't know is just a little farther down stream Crap.
This after we got Chuck's light boat around the blowdown. Then the real work started. As a very orgainized crew that we are (herdin cats)
we start carrying each boat around the strainer to continue down the river.
This what it looked like after the portage. Lots of good hard work by all got us through and back to floatin.
Here comes another one but not as bad. we just wormed through it. well most did. this one take Van for an unexpected swim. He seemed to think it was just the thing to do.
Here I think Ray was lookin to see if Harry SR was gonna come with him or stay behind.
I think he finnally said OK I Will Just Wait then
I'mLeavin Come On
Here we go
Finally the first camp
We stayed for 2 nights so Van could dry out and start a Chinese Laundry Service.
Then Supper
Bear eaten the end of Vals Chile that we had on the sausages Chuck brought for all here. Biggest sausages I ever seen.
After 2 nights it was back on the river.
OH before we leave this camp let me say we made it 3 whole miles on day one.
Camp 2
Made good milage this time probably 7.5 miles. Geezer warp speed.
Slight rain shower at this camp.
Full Moon over the river
Nightly Fire and fix all the worlds ills
Mac is in charge
Here is the Privy that all were wantin to see. Built and hauled by Harry SR
More to come the sequel and rest of the story
Joe