After much delay everything is finally in order so I can start the NorthWind as a strip build. I have had the plans for so long I am surprised Matt has not shown up to repo them.
The boat was designed by JEMWATERCRAFT.com as a stitch and glue, but I asked Matt to redraw it for me as a stripper so it will be a one of a kind for now. Matt calls this boat the "Northwind" and it is based off of Verlen Kruger's "SeaWind".
I started by building a new table for the stiffback to mount on.
I will start cutting out the patterns for the boat over the next few days. I usually take about two weeks or so to get the forms cut out and build the stiffback before you ever start building the boat. This is what you get as far as plans. Each of those patterns will be cut out and glued to plywood to make the form of the boat before applying Wester red cedar strips.
To make something that will look kinda like this.
The boat was designed by JEMWATERCRAFT.com as a stitch and glue, but I asked Matt to redraw it for me as a stripper so it will be a one of a kind for now. Matt calls this boat the "Northwind" and it is based off of Verlen Kruger's "SeaWind".
I started by building a new table for the stiffback to mount on.
I will start cutting out the patterns for the boat over the next few days. I usually take about two weeks or so to get the forms cut out and build the stiffback before you ever start building the boat. This is what you get as far as plans. Each of those patterns will be cut out and glued to plywood to make the form of the boat before applying Wester red cedar strips.
To make something that will look kinda like this.