That is how Matt suggests that his boats are made in place of just using the copper wire stitches. A lot of the build pictures of the JEM Watercraft boats being made show that process.
I'll have to go read up on that. I understand zip ties instead of wire, I'm just misterfied by the popsicle sticks. But I spend a lot of time misterfied.
(inner) gunwales are installed. I need to get access to an electric planer before I install the outer gunwales. The lumber I used for the gunwales are a pine 1x2 (5/8 x 1-1/2) and when I mocked fitted a 8 foot piece for an outer gunwale I found it an extremely tight fit. Not sure how it would look if I tried to splice two piece together. So I think I'm going to plane them down to about 1/2" thickness. Hopefully they'll be a little more limber.
And for those who like the caroling frogs (that I haven't finished in 2 Christmases :shock: ) ... :lol:
Been a busy weekend. Fiberglass tape and small coat of resin is down. going to come back with the glass cloth and cover the entire bottom and crap around the sides as much as possible. should get about 1 or 2 inches overlap on the tape.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.