There was a mobile home here that was about 30 years old so the landowner had it hauled away for us. He also brought us a skid steer loader to use for the weekend to clean up the old foundation around the mobile home. Once we got all of the rocks and trash hauled away it was time to get busy. We pre-fabed the cabin and then dismantled it for the ride to the lease.
We used the skid steer to unload it and move it into place.
Once it was in place we leveled the floor and blocked all the way around.
Then it was time to stand the walls up and lag bolt them to the floor.
Then onto the roof trusses and the sheet metal.
Today we wired, plumbed, insulated and hung the OSB on the interior walls. My batteries died in the camera so I did not get any pics, but I will take a pic of it completed next weekend.
We used the skid steer to unload it and move it into place.
Once it was in place we leveled the floor and blocked all the way around.
Then it was time to stand the walls up and lag bolt them to the floor.
Then onto the roof trusses and the sheet metal.
Today we wired, plumbed, insulated and hung the OSB on the interior walls. My batteries died in the camera so I did not get any pics, but I will take a pic of it completed next weekend.